MAIN | Pinnacle@Duxton Gallery | City View@Boon Keng | LEGO |Modular Buildings | History | Links
 

Visit Forum 2 Chat
>> P@D Forum

Best Sellers:


10197 Fire Brigade
S$299.90


10211 Grand Emporium
S$339.90


10211 Grand Emporium
S$399.90


10211 Grand Emporium
S$339.90


Update: 06 Oct 2011

>> WebMail <<

 

Sign My Guestbook
View My Guestbook


IT Pdts Price Guide

 
 
hit counter
hit counters
Uniquely Maxxum Interactive 1997 - 2011

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Powered by:
Maxxum Interactive


Email 2 Webmaster

         The Pinnacle@Duxton 达士岭 - Singapore's Tallest Public Housing
 
     Latest LEGO Arrival:
Pet Shop
LEGO 10218 Pet Shop - New arrival Sep 2011 S$299.90

Pet Shop
LEGO 10220 Volkwagon T1 Camper Van - Coming Soon!

Pet Shop
LEGO 10222 Winter Village Post Office - Coming Soon!

Pet ShopPet Shop
                          LEGO #3677 Red Cargo Train also Coming Soon!

LEGO NEWS - Your Fav Source...

Pet Shop
24.09.11 - Available only to LEGO® VIP Program Members (US and Europe), this exclusive mini modulars set is an authentic miniature representation of the first 5 buildings in the Modular Building series: Café Corner, Market Street, Green Grocer, Fire Brigade and Grand Emporium.

• Each building can be displayed individually or connected to the other buildings in the set!
• All buildings feature fantastic detailing and a wide variety of elements and colors!
• Completed model measures over 5" (14.5 cm) tall, 12" (32 cm) long and 2.5" (6.5 cm) wide!
• Each individual building measures 2.5" (6.5 cm) long and 2.5" (6.5 cm) wide!
• Available from 1st Jan 2012 (not in S'pore) for US$79.99

Singapore's Tallest HDB Flats @ 50 storey

* Unique Skybridges at Level 26 & 50
* Running Track at Level 26 Sky Garden"
* 1848 units S1 (93-97) & S2 (105-108sqm) flats

>> www.hdbhubber.com 
A dedicated portal focusing on HDB blockbuster projects on DBSS (Design, Build & Sell Scheme) and BTO (Built-To-Order) schemes.

40 Storey HDB Flats


All other DBSS or BTO projects such as Natura Loft @ Bishan, City View @ Boon Keng or Park Central @ AMK are available via www.hdbhubber.com
 

   

  The Pinnacle@Duxton - S'pore 1st 50 Storey HDB Flat in 2009

05th Dec 2009 - Finishing touches all across the site as key collections is just next weekend onwards!

02th September 2009
- Lifting process of the last 26th floor skybridge @ Blk 1A-1B. Projected completion is dec 2009.

23th June 2009
- Leaked Photos of the internal units (copyright of respective owners and show here for personal reference only).

23th June 2009
- More Leaked Photos of the internal units and the views future owners will enjoy.....

23th June 2009
- Blk 1E-1F 26th Floor skybridge lifting within next few days. Blk 1F-1G Skybridges constructing final cladding & 3rd floor shelted walkway.

26th May 2009
- Blk 1B-1C 50th Storey Skybridge lifting up (should be completed by 7pm), Blk 1A-1B bridges also in development

26th May 2009
- Majority of the work are now on interior fittings, skybridges (Blk1D-1E/1E-1D/etc) and roof structure (Blk 1B & 1C)

15th May 2009
- Not much changes from 2 days back. Blk 1G's crane totally removed (full completion within 2 months for blk 1G)

12th May 2009 - Largest Skybridge (Blk 1E-1F) lifting up....to maximum 50 storey height.

11th May 2009
- Largest Skybridge (Blk 1E-1F) lifting up....to resume on 11th to reach maximum 50 storey height.

28th Apr 2009
- All blocks reaches 50 storey. Skybridges and ground-work (carpark, etc) ongoing...

30th Jan 2009
- Skybridges for Blk 1F-1G hoisted up, Blk 1E-11F in progression. Blk 1C reached Level 49....

04th Oct 2008 - Skybridges for Blk 1D/1E & 1F/1G have started constructing!

22th Sep 2008
- Blk 1B & 1C are rushing upwards at a frantic pace. Should reach storey 50 by the end of 2008.

20th Sep 2008
- Massive paint work for Blk 1G/1F/1E on the way for Level 25 and below in conjunction of MM Lee K.Y's visit in Nov 2008.

19th July 2008
- Blk 1A reaches 50 Storey and 50 Storey (water tank & lift) for Blk 1G

19th April 2008
- Blk 1A reaches 45 Storey and 49 Storey for Blk 1G

31st March 2008
- Blk 1A reaches 42 Storey and 47/48 Storey for Blk 1G

11th February 2008 - Blk 1A reaches 35/36 Storey and 46/47 Storey for Blk 1G

18th January 2008 - Blk 1A reaches 35/36 Storey and 46/47 Storey for Blk 1G.

26th December 2007 - Blk 1A reaches 32 Storey and 44 Storey for Blk 1G

18th November 2007 - Progesssion slowed down during the period of Jun - Sep 07 while Blk 1A reaches 30 Storey and 39 Storey for Blk 1G

Begins in April 2005, the construction gets underway and expected to be completed by early 2009. Photos taken in 2005 - 2006. 

Photos displayed above were copyright of respective photographers.

Maxxum Interactive Affiliate-Network partners
| SgBay Portal |
Fingers crafted & developed by Maxxum Interactive 1997-2011.
Designed & layout by SgCube Designs.